A very welcome arrival out of the morning mist was Stephen Hall's digger and Jim its driver:


They were here to remove the remaining piles of subsoil from the site and to populate the steep embankment with topsoil which involved heavy  lifting and shifting as well as careful spadework.

Our embankment preparation with dry stone walls and timber terracing seems to be just the job.  Tomorrow should see The Sidings site entrance topped up and levelled and a top dressing of Horton Quarry blue gravel.

Meanwhile the inside stud partition walls received their sound-proofing insulation:


The kitchen is now plaster-boarded bar for the window and door reveals in readiness for kitchen fitters to do a final measure-up tomorrow: