How's this for a neat job? The southern entrance to the water tower showing the new extension, awaiting its stairway (at the galvanisers) and its rain-screen cladding panels. The cleared, levelled and now topped-off parking / access area is just the ticket. There is hardly a hint that at times during much of 2019 this area of the site has either been excavated for installation of extension services or used as a storage area for topsoil and other excavated materials from this challenging site.
No comments:
Post a Comment
Do please leave comments. If nothing else it shows that there is somebody out there.