Here the final floor panel comes in to land. Every aspect of the crane is being controlled wirelessly by Brian Thornton in the orange clothing whilst architect Stuart Green looks on.
The view from the existing annex landing. Infill panels go between the main panels.
Below are pictures of the first batch of wall panels; the four corners are on top of the stack.
A close up of the reinforcements at the ends of the panels, laser cut to precise sizes for an exact and massively strong fit:
Everything labelled to perfection:
No comments:
Post a Comment
Do please leave comments. If nothing else it shows that there is somebody out there.