Now that we have been able to identify and distribute the excellently made new cladding panels I plucked up courage today and fixed the first two in place. They are ground level panels chosen to enable me to get the er, hang of them. So far, so good.
The wider gap nearest the camera will be closed up to 15mm in due course. The two panels to the sides of the window are still to be manufactured, along with ten or 12 others, deliberately being held back as a second phase to ensure total accuracy. I am doing this work myself after some local misunderstandings.
Next stage is the roof parapet panels.
Pretty picture today is of wild flower meadows near Austwick:
No comments:
Post a Comment
Do please leave comments. If nothing else it shows that there is somebody out there.