Search This Blog

Saturday, 15 February 2020

Kitchen Finished

Key day yesterday with the kitchen tiling finished by wizard kitchen fitter Andy Escriett


Not only that the b.a.a.f., which had been in store for a couple of years was reinstalled by Fisher and Paykel engineer Len from Halifax.  I had worried that being stabled outdoors through two winters may have damaged it.  Anyway it is now fully installed and working with a couple of faults found and cleared.  Not only that, Len was able to arrange things so that water filters were eliminated from the iced water supply and the ice maker systems.  Our water in Settle is crystal clear and it is just not sensible to have filters in the system which will over time clog up with gunge through which drinking water must pass!

These fantastic fridge freezers and their filters are a bit like printers and their ink cartridges . . . expensive and short lived!


Storm Dennis is due this weekend.  Son-in-law Alan is flying in from New York overnight - or not as the case may be.  Once here he and the boys James and Ben are travelling here by train amidst the storm and pestilence.  Maybe.

A priority is to get the extension's furniture, which has been stored in various nooks and crannies round and about the tower, in place in the extension.


No comments:

Post a Comment

Do please leave comments. If nothing else it shows that there is somebody out there.