Big digger here today and clear plan in hand to finish the serious earth moving.  There is some deep digging to do before two final foundations are poured today for the steel columns at the far end in this picture.   The galvanised columns themselves are here on Monday so then the building should fly up.

Hard to imagine it at this stage but we are excited about how the whole finished building, and surroundings, will look.

Yesterday the massive steel perimeter beams had their tops covered in 47mm thick timber on which the outside walls will soon sit.   Roofing men coming today to do their sums.