The old floor removed
The stone floor of the tower has been removed and stored outside for re-use. The level inside has been reduced by 350mm to enable a solid floor plus insulation to be laid.
All the windows have now been glazed so we are weather tight.
All this before a builder has started. This is a rather unusual state of affairs but it should make things a good deal easier when building work proper starts - the sooner the better.