Search This Blog

Saturday 30 July 2011

Ground floor rooms emerge and the annex has a roof

This view, looking from the south shows, from the front, Bedroom #2, the main bathroom (behind the studwork) and Bedroom # 1.

This is bedroom #1 showing the insulation of the floor and outside walls.

This is inside the main bathroom and shows the heat recovery ventillation ducts, carefully recessed into the ceiling.

Possibly the most boring picture on this Blog - but a milestone even so - the roof of the annex, completed.
Posted by Picasa

No comments:

Post a Comment

Do please leave comments. If nothing else it shows that there is somebody out there.